Files
Abstract
An analogue method of ex post evaluation of small watershed project performance is demonstrated for watersheds with projects versus those without projects. Benefits are measured directly as production gains or losses. Ex post economic and environmental values are integrated directly from land use changes and from surrogate land value changes.