Files
Abstract
The primary function of equipment managers is to replace the right equipment at the right time
and at the lowest overall cost. In this paper, the opportunities and challenges associated with
equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review
of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second,
a dynamic programming (DP) based optimization solution methodology is presented to solve the
ERO problem. The Bellman’s formulation for the ERO deterministic (DDP) and stochastic dynamic
programming (SDP) problems are discussed in detail. Finally, comprehensive ERO numerical
results and implications are given.