Go to main content

Each extractor has a distinct quadratic extraction cost and faces a linear industry demand schedule. We observe that the open loop and closed loop solutions are the same if initial stocks are such that each competitor is extracting in every period in which her competitors are extracting.

Metric
From
To
Interval
Export
Download Full History